In 2006, Metronet commissioned our client Serco Rail Technologies Ltd in Derby to design and integrate an Unattended Track Geometry System onto an existing D78 passenger vehicle.
OTDS were engaged on the project to provide our client with all the Mechanical Engineering Designs required for the integration of a bespoke Track Geometry System onto the vehicle / bogie.
OTDS have also been responsible for all the mechanical designs and installation drawings for the following bespoke areas of work:
OTDS 3D modelled the existing vehicle and bogie from the existing design drawings, after which we systematically integrated the new bespoke systems onto the vehicle or bogie.
Other services that OTDS have provided include supporting the project with visualizations, installation / manufacture support and liaison with specialized engineers.